MEPF Design Pro

Physics-Driven Engineering & Bid Estimating

Free preview

Project & Geometry

Type an address or city — City, Country and design Ambient Temp fill in automatically.

Measure around the outside walls of a single typical floor, not all floors added together. For a 4375 m² floor plate the expected range is 235–378 m.

Mid-range branded devices and sanitary ware. Scales luminaires, switches, receptacles, exterior fixtures and plumbing fixtures × 1.00.

Leave blank to derive from floor area and occupancy.

Commercial Parameters

Cooling Load
4,117.7RT

Refrigeration tons

Electrical Demand
5,250kVA

Connected load

Peak Water Flow
48.2L/s

Domestic demand

Total Airflow
1,647,060CFM

Supply air @ 400 CFM/RT

Location Cost Basis

US base, adjusted to Chicago metro, United States

Effective labour cost

$78 / h

US$65/h × 1.2 labour index
Labour share 38.8% · source 2026-01

  • Labour cost per hour

    Effective US$78/h is within the expected US$42.9–US$133/h for United States.

  • Labour share of direct cost

    Labour is 38.8% of direct cost, within the 15–55.00000000000001% expected for this occupancy.

  • Productivity vs. labour index

    Hours: 182,909 US-crew h × 1 productivity = 182,909 h (5.23 h/m² vs. 5.23 h/m² US). Rate: US$65/h × 1.2 index = US$78/h. Net labour cost = 1.2 × US — each factor applied once, on a different quantity (hours vs. $/h), so nothing is double counted.

  • MEPF cost per m²

    US$1,051/m² direct vs. expected US$495–US$1,210/m² for Hospital / Healthcare in United States.

US base — RSMeans-style national average

Financial Buildup

Tap any line to see how it is derived from your inputs

Final Executable Bid Price

$55,567,034

Direct · 66.2%
Overheads · 8.4%
Contingency + Tax · 6.7%
Profit · 18.7%

Execution Metrics

Bromilow time-cost model

182,909hrs

Total labor hours

30.4mo

Estimated duration

128pax

Peak manpower

System Set

Chosen by occupancy — switch any system on or off

  • rooms, bathrooms, kitchens not entered, so they were derived from GFA (rooms 1250, bathrooms 500, kitchens 14). Lines that depend on them are marked Low confidence.

Mechanical / HVAC Works

Split / VRF air-conditioning

Cooling 4,118 TR > 150 TR: served by chilled water instead

Chilled-water plant

Threshold: > 150 TR non-residential (this building 4,118 TR)

Central air distribution (AHU & ductwork)

Non-residential: ducted fresh air and zoning (ASHRAE 62.1)

Ventilation & exhaust fans

Toilet and kitchen exhaust always required (ASHRAE 62.1 / 62.2)

BMS & HVAC controls

Critical facility: monitored plant and alarms

Electrical Works

MV switchgear & transformers

Demand 5,250 kVA > 500 kVA LV service limit

Service entrance, main panel & sub-panels

MDB and distribution boards always required

Standby generator

Essential power mandatory (NFPA 99 / NFPA 110)

Lighting

Always required: sized by room count

Receptacles & switches

Always required: sized by rooms, kitchens and bathrooms

Wiring, feeders & raceways

Always required: sized from circuit count

Grounding & lightning protection

Always required (PEC / NEC Art. 250)

ELV: data, CCTV & access control

Non-residential: data, CCTV and access control in scope

Equipment circuits (A/C, water heaters, pumps)

Non-residential: equipment circuits are carried in the distribution-board circuits

TV & data points

Non-residential: covered by ELV structured cabling

Ceiling fans

Not typical for this occupancy

Kitchen appliance & washer / dryer circuits

Non-residential: carried in the distribution-board circuits

Exterior lighting & weatherproof outlets

Site lighting is carried in Lighting for this occupancy

Gate motor & circuit

Not typical for this occupancy: add if in scope

Solar-ready conduit & spare breaker

Optional: roof-to-panel conduit and spare breaker for future PV

Security / intercom allowance

Non-residential: covered by ELV access control

Plumbing & Sanitary Works

Plumbing fixtures

Always required: counted from bathrooms and kitchens

Water supply piping

Always required

Sanitary drainage & treatment

Always required: includes STP sizing

Storm drainage

Always required: roof and site drainage

Water heaters & hot water

Central calorifiers sized by hot fixtures

Booster pump & water tank

Critical facility: on-site storage mandatory

Fire Protection Works

Smoke detection

Addressable detectors on the fire alarm loop

Portable fire extinguishers

Always required (NFPA 10 / RA 9514)

Automatic sprinklers

Required for healthcare and assembly occupancies

Fire pumps & fire water storage

Sprinklered and > 5,000 m² or > 15 m: mains pressure inadequate

Standpipes & hose cabinets

Threshold: ≥ 4 storeys, > 15 m, or > 2,500 m² non-residential

Addressable fire alarm system

Required for this occupancy (NFPA 72 / RA 9514)

Clean-agent suppression

IT / server / archive rooms protected

Unlock the detailed MEPF estimate

The full four-discipline Bill of Quantities, discipline cost breakdown, and codes compliance report are part of MEPF Design Pro.

Single Project
One detailed 4-trade estimate, then export
₱1,999/ one-use
One complete 4-trade bid estimate
  • Full 4-discipline detailed BOQ
  • Discipline cost breakdown
  • Codes & standards compliance report
  • Export once to PDF or Excel
  • Session ends after you export
MonthlyPopular
Unlimited 4-trade estimates, billed monthly
₱3,999/ month
Unlimited 4-trade estimates & exports
  • Everything in Single Project
  • Unlimited detailed estimates
  • Unlimited PDF & Excel exports
  • All engineering tool calculators
  • Global code library (all regions)
EnterpriseDeal of the Year
Best value — 2 months free
₱39,990/ year
≈ ₱3,333/mo billed yearly
Enterprise exclusiveAll MEPF calculation formulas — all 4 trades
  • Everything in Monthly
  • Full calculation-formula reference (exclusive)
  • 12 months for the price of 10
  • Priority calculation engine
  • Custom regional code packs
  • Priority support

Secure payments via PayMongo (card, GCash, Maya, GrabPay). By purchasing you agree to our Terms and Privacy Policy.