MEPF Design Pro
Physics-Driven Engineering & Bid Estimating
Project & Geometry
Type an address or city — City, Country and design Ambient Temp fill in automatically.
Measure around the outside walls of a single typical floor, not all floors added together. For a 4375 m² floor plate the expected range is 235–378 m.
Mid-range branded devices and sanitary ware. Scales luminaires, switches, receptacles, exterior fixtures and plumbing fixtures × 1.00.
Leave blank to derive from floor area and occupancy.
Commercial Parameters
Refrigeration tons
Connected load
Domestic demand
Supply air @ 400 CFM/RT
Location Cost Basis
US base, adjusted to Chicago metro, United States
Effective labour cost
$78 / h
US$65/h × 1.2 labour index
Labour share 38.8% · source 2026-01
Labour cost per hour
Effective US$78/h is within the expected US$42.9–US$133/h for United States.
Labour share of direct cost
Labour is 38.8% of direct cost, within the 15–55.00000000000001% expected for this occupancy.
Productivity vs. labour index
Hours: 182,909 US-crew h × 1 productivity = 182,909 h (5.23 h/m² vs. 5.23 h/m² US). Rate: US$65/h × 1.2 index = US$78/h. Net labour cost = 1.2 × US — each factor applied once, on a different quantity (hours vs. $/h), so nothing is double counted.
MEPF cost per m²
US$1,051/m² direct vs. expected US$495–US$1,210/m² for Hospital / Healthcare in United States.
US base — RSMeans-style national average
Financial Buildup
Tap any line to see how it is derived from your inputs
Final Executable Bid Price
$55,567,034
Execution Metrics
Bromilow time-cost model
Total labor hours
Estimated duration
Peak manpower
System Set
Chosen by occupancy — switch any system on or off
- rooms, bathrooms, kitchens not entered, so they were derived from GFA (rooms 1250, bathrooms 500, kitchens 14). Lines that depend on them are marked Low confidence.
Mechanical / HVAC Works
Split / VRF air-conditioning
Cooling 4,118 TR > 150 TR: served by chilled water instead
Chilled-water plant
Threshold: > 150 TR non-residential (this building 4,118 TR)
Central air distribution (AHU & ductwork)
Non-residential: ducted fresh air and zoning (ASHRAE 62.1)
Ventilation & exhaust fans
Toilet and kitchen exhaust always required (ASHRAE 62.1 / 62.2)
BMS & HVAC controls
Critical facility: monitored plant and alarms
Electrical Works
MV switchgear & transformers
Demand 5,250 kVA > 500 kVA LV service limit
Service entrance, main panel & sub-panels
MDB and distribution boards always required
Standby generator
Essential power mandatory (NFPA 99 / NFPA 110)
Lighting
Always required: sized by room count
Receptacles & switches
Always required: sized by rooms, kitchens and bathrooms
Wiring, feeders & raceways
Always required: sized from circuit count
Grounding & lightning protection
Always required (PEC / NEC Art. 250)
ELV: data, CCTV & access control
Non-residential: data, CCTV and access control in scope
Equipment circuits (A/C, water heaters, pumps)
Non-residential: equipment circuits are carried in the distribution-board circuits
TV & data points
Non-residential: covered by ELV structured cabling
Ceiling fans
Not typical for this occupancy
Kitchen appliance & washer / dryer circuits
Non-residential: carried in the distribution-board circuits
Exterior lighting & weatherproof outlets
Site lighting is carried in Lighting for this occupancy
Gate motor & circuit
Not typical for this occupancy: add if in scope
Solar-ready conduit & spare breaker
Optional: roof-to-panel conduit and spare breaker for future PV
Security / intercom allowance
Non-residential: covered by ELV access control
Plumbing & Sanitary Works
Plumbing fixtures
Always required: counted from bathrooms and kitchens
Water supply piping
Always required
Sanitary drainage & treatment
Always required: includes STP sizing
Storm drainage
Always required: roof and site drainage
Water heaters & hot water
Central calorifiers sized by hot fixtures
Booster pump & water tank
Critical facility: on-site storage mandatory
Fire Protection Works
Smoke detection
Addressable detectors on the fire alarm loop
Portable fire extinguishers
Always required (NFPA 10 / RA 9514)
Automatic sprinklers
Required for healthcare and assembly occupancies
Fire pumps & fire water storage
Sprinklered and > 5,000 m² or > 15 m: mains pressure inadequate
Standpipes & hose cabinets
Threshold: ≥ 4 storeys, > 15 m, or > 2,500 m² non-residential
Addressable fire alarm system
Required for this occupancy (NFPA 72 / RA 9514)
Clean-agent suppression
IT / server / archive rooms protected
Unlock the detailed MEPF estimate
The full four-discipline Bill of Quantities, discipline cost breakdown, and codes compliance report are part of MEPF Design Pro.
- Full 4-discipline detailed BOQ
- Discipline cost breakdown
- Codes & standards compliance report
- Export once to PDF or Excel
- Session ends after you export
- Everything in Single Project
- Unlimited detailed estimates
- Unlimited PDF & Excel exports
- All engineering tool calculators
- Global code library (all regions)
- Everything in Monthly
- Full calculation-formula reference (exclusive)
- 12 months for the price of 10
- Priority calculation engine
- Custom regional code packs
- Priority support
Secure payments via PayMongo (card, GCash, Maya, GrabPay). By purchasing you agree to our Terms and Privacy Policy.